Public works
Some of our completed works, guided by our professionalism and experience:
UTE Cerdà (L-9)
Barcelona, year 2006
Screen wall digging 16 metres deep, armouring and concrete dumping with bentonitic muds.
Sagrada Família
Barcelona, year 2007
Screen wall digging 18 metres deep, armouring and concrete dumping with bentonitic muds.
Pompeu Fabra at the junction with Llacuna (Dragados)
Barcelona, year 2007-2008
Screen wall digging 14 metres deep, armouring and concrete dumping with bentonitic muds.
Pallars at the junction with Av. Diagonal
Barcelona, year 2006
Screen wall digging 12 metres deep, armouring and concrete dumping with bentonitic muds. Screen wall milling.
Diagonal Mar, "Llave de Oro" Building
Barcelona, year 2007
Screen wall digging 12 metres deep, armouring and concrete dumping with bentonitic muds. Screen wall milling.